Welcome, Guest. Please login or register.
May 12, 2024, 09:29:10 PM

Login with username, password and session length

Recent Topics

[Today at 06:56:56 PM]

[Today at 05:50:54 PM]

[Today at 04:55:30 PM]

[Today at 03:14:18 PM]

[Today at 02:04:00 PM]

[May 10, 2024, 10:34:49 PM]

[May 10, 2024, 09:50:31 PM]

[May 10, 2024, 08:04:41 PM]

[May 10, 2024, 07:53:03 PM]

[May 10, 2024, 04:13:44 PM]

[May 10, 2024, 03:35:39 PM]

by capo
[May 10, 2024, 12:49:47 PM]

[May 09, 2024, 01:04:03 PM]

[May 09, 2024, 10:15:40 AM]

[May 09, 2024, 08:12:28 AM]

[May 09, 2024, 07:35:53 AM]

[May 09, 2024, 06:46:52 AM]

[May 08, 2024, 04:58:49 PM]

[May 08, 2024, 12:29:15 PM]

Support NCKA

Support the site by making a donation.

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - Martianfish

Pages: 1 [2] 3 4 ... 48
16
General Talk / Re: ARW overhaul 01 - 10 - 20 update
« on: January 17, 2020, 07:04:17 AM »
Where does the waste go in the fish cleaning station.


into the sewer system

17
General Talk / Re: ARW overhaul 01 - 10 - 20 update
« on: January 10, 2020, 10:26:16 AM »
Update: 01-10-20. Parking lot being striped today. Bathrooms are not 3 stalled, only 2 with center one being the electrical/plumbing room. Wash station will have hoses on each end (how long they last???), so bring a short one of your own so you can do a wash down your gear. On the fish cleaning station it has a push pipe (loose, how long it lasts???) for pushing the guts, etc. down the pipe.  Electrical switch on end for grinder.  It may be a while before the toilets are operational, porto potties will still be available.

18
Sorry guys,😱😱 but you are going to have to wait till I tell you when ARW is open 😍😍(not yet)😴😴😴😴

19
General Talk / Re: ARW overhaul 01 - 07 - 20 update
« on: January 07, 2020, 01:52:52 PM »
Supposedly the 19th of this month it will be open. If not by the end of the month. You can always launch from the beach (yaks!) which is just to the right of the ramp and is on the inside of the wall. The last few days when I was down there checking the weather has been perfect, hardly any wind and flat calm water and very good visibility.

20
General Talk / Re: ARW overhaul 01 - 07 - 20 update
« on: January 07, 2020, 11:44:04 AM »
Quick update. 01-07-20. Paving underway on ramp area. Paving smooth the endcaps will be done tomorrow.

21
General Talk / Re: ARW overhaul 01 - 03 - 20 update
« on: January 03, 2020, 02:28:50 PM »
No dredging of a channel👎👎. The only dredging was to extend the ramp about 20 some feet further, so when the mud fills back it will be the same as before.

22
General Talk / Re: ARW overhaul 01 - 03 - 20 update
« on: January 03, 2020, 01:17:57 PM »
01-03-20 update. Grading being done on area above ramp in preparation of putting down asphalt (next week early), will check Tuesday. Fish cleaning station in place (not unwrapped yet).

23
General Talk / Re: ARW overhaul 12 - 27 - 19 update
« on: December 27, 2019, 01:35:59 PM »
Update 12 - 27 - 19. Does not look like any work completed this week due to weather and holiday.

24
General Talk / Re: ARW overhaul 12 - 20 - 19 update
« on: December 20, 2019, 09:46:39 AM »
Update 12-20-19. Not much completed this week due to weather. The cement around the bathrooms and sidewalk in front was poured.

25
General Talk / Re: ARW overhaul 12 - 13 -19 update
« on: December 13, 2019, 09:17:30 AM »
Update 12-13-19. The endcaps for the parking are being clean up cut for paving — meaning no more endcaps, but the parking is supposed to be stripped.  The shower will be pushbutton timed, so you will be able to push the button and walk thru yourself and kayak for a quick rinse.  The weather has delayed it a little but they are still scheduled for mid-January being done. 

26
General Talk / Re: ARW overhaul 12 - 06 -19 update
« on: December 06, 2019, 09:33:38 AM »
12-06-19 update. Not much to report this week due to weather. Ramp reinstalled to float on school side. Minor grading work above ramp. No one working today??

27
Safety First / Re: Rescued kayak anglers running thread
« on: November 30, 2019, 10:17:14 AM »
I think each rescue should be individual as they are unique in their own way. We all know that each rescue is not textbook. That way we can pick up the differences and store them in our memories for future use (not that I want to do that, but we know it will happen). Stay Safe

28
General Talk / Re: ARW overhaul 11 - 29 -19 update
« on: November 29, 2019, 09:57:08 AM »
Update 11-29-19. Not much to report this week as it is a short workweek. Electrical power cables installed. Roadway directly above ramp has been graded. Grading work around bathrooms in progress. No pictures this week.

29
General Talk / Re: ARW overhaul 11 - 22 -19 update
« on: November 23, 2019, 10:01:41 AM »
Nothing done to the parking lot. The only thing that I heard was the endcaps need to be done and then striped

30
General Talk / Re: ARW overhaul 11 - 22 -19 update
« on: November 22, 2019, 11:49:18 AM »
You can launch anytime from the beach (inside of wall). The ramp probably late December or early January. The ramp is an easier slope than the old one so there should be less butt contacts to it😂😂